JOB FLOW – LARGE LOSS MITIGATION

Mobilization
• Dispatch Desiccant Dehumidification Technical Consultant
• Dispatch Desiccant Dehumidification Project Manager
• Transport Equipment and Crew

Inspection, Evaluation, and Scoping
• Inspect and Evaluate Water Damage to Structure
• Determine Moisture Content of Affected Structural Materials
• Establish Baseline Moisture Content of Structural Materials
• Determine Ambient Specific Humidity
• Establish Baseline Ambient Specific Humidity
• Begin Moisture Mapping

Project Requirements
• Size Dehumidification and Evaporation Equipment
• Assess Safety and Security Issues
• Assess Electrical Requirements
• Determine Access For Return and Supply Ducting
• Schedule Daily Progress Meeting with Property Management
• Submit Scope of Work and Project Cost
• Obtain Work Authorizations / Signed Contracts for Work
• Carpentry as Required
• Electrical as Required
• Engineer Temporary Ducting
• Install Temporary Ducting
• Power-up Dehumidifiers
• Unload Airmovers
• Inventory Airmovers
• Place Airmovers
• Power-up Airmovers
• Remove cove base and trim where necessary
• Perforate walls and flooring where necessary

Monitoring and Testing
• Test and Record Moisture Content of Structural Materials
• Test and Record Ambient Specific Humidity
• Project Maintenance
• Re-Engineer Temporary Ducting as Require

Project Completion and Demobilization
• Final Inspection and Walk Through
• Obtain Final Completion Forms
• Remove Temporary Carpentry
• Remove Temporary Electrical
• Remove Soft Ducting
• Remove Airmovers

 
     

Concrete Drying

A Guide to Flooring Moisture Problems

Facts Everyone Should Know About Flooring Installations Over Concrete

Solutions to Concrete Slab Moisture Issues

Job Flow – Large Loss Mitigation

LMS Satisfaction Form