JOB FLOW – LARGE LOSS MITIGATION Mobilization • Dispatch Desiccant Dehumidification Technical Consultant • Dispatch Desiccant Dehumidification Project Manager • Transport Equipment and Crew Inspection, Evaluation, and Scoping • Inspect and Evaluate Water Damage to Structure • Determine Moisture Content of Affected Structural Materials • Establish Baseline Moisture Content of Structural Materials • Determine Ambient Specific Humidity • Establish Baseline Ambient Specific Humidity • Begin Moisture Mapping Project Requirements • Size Dehumidification and Evaporation Equipment • Assess Safety and Security Issues • Assess Electrical Requirements • Determine Access For Return and Supply Ducting • Schedule Daily Progress Meeting with Property Management • Submit Scope of Work and Project Cost • Obtain Work Authorizations / Signed Contracts for Work • Carpentry as Required • Electrical as Required • Engineer Temporary Ducting • Install Temporary Ducting • Power-up Dehumidifiers • Unload Airmovers • Inventory Airmovers • Place Airmovers • Power-up Airmovers • Remove cove base and trim where necessary • Perforate walls and flooring where necessary Monitoring and Testing • Test and Record Moisture Content of Structural Materials • Test and Record Ambient Specific Humidity • Project Maintenance • Re-Engineer Temporary Ducting as Require Project Completion and Demobilization • Final Inspection and Walk Through • Obtain Final Completion Forms • Remove Temporary Carpentry • Remove Temporary Electrical • Remove Soft Ducting • Remove Airmovers |